Marseille-Fos Port Achieves First Shore Power Connection for Ship Under Repair

The AIDAmar, undergoing modernisation in dry dock 8, is connected to the port's electrical grid.

Generic image of a large cruise ship docked at an industrial port terminal, connected to electrical cables, under a blue Mediterranean sky.
AI

Generic image of a large cruise ship docked at an industrial port terminal, connected to electrical cables, under a blue Mediterranean sky.

The Grand Port Maritime de Marseille announced it has achieved the first shore power connection for a ship undergoing major repair. The operation concerns the AIDAmar, a cruise ship from AIDA Cruises, currently undergoing modernisation in dry dock 8 of the Eastern basins.

Key points

  • AIDAmar ship undergoing modernisation in dry dock 8
  • Cooperation between the Port, Shipyard, and shipowner
  • Extension of the CENAQ scheme to this new activity
This technical success relies on close cooperation between the Grand Port Maritime, the Marseille Shipyard, and the shipowner. It reflects a shared commitment to connecting ships under repair to the electrical grid, even though no regulation currently mandates this practice. This connection extends the "CENAQ (Shore Power Connection for Ships) – Zero Smoke Calls" scheme to a new industrial activity.
The CENAQ scheme was initially deployed for ferries as early as 2017, then extended to cruise ships in 2026. This new step marks a significant advance in reducing pollution emissions related to port and ship maintenance activities in Marseille-Fos.
Based on information from the official source: Grand Port Maritime de Marseille (26/11/2026)