In Toulon, footbridge repair at Saint-Louis du Mourillon port until 4 December

The TPM Metropolis ensures service continuity with a temporary footbridge for users.

Generic image of a temporary metal footbridge on a stone pier, with blue water in the background.
AI

Generic image of a temporary metal footbridge on a stone pier, with blue water in the background.

The Toulon Provence Méditerranée (TPM) Metropolis is carrying out repair works on the access footbridge to the East jetty of the Saint-Louis du Mourillon port. The operation, entrusted to the company ECTM, will continue until 4 December 2026.

Key points

  • Cost of works: €82,350.41
  • Duration: until 4 December 2026
  • ECTM company in charge of works
These works aim to guarantee the longevity of the structure and to ensure safe access conditions for all users of the port. In order to limit the impact on circulation during the construction period, a temporary footbridge has been installed. It allows pedestrians to continue accessing the jetty while ensuring their safety during the operations.
The works, with a total cost of €82,350.41, have an estimated duration of one month. They will continue until 4 December 2026, subject to technical or weather-related delays. With this operation, the TPM Metropolis is continuing its policy of modernisation and maintenance of port facilities, essential for maintaining safe infrastructure adapted to users' needs.
Based on information from the official source: Ports Toulon Provence Méditerranée (25/11/2026)